Media

Additional Construction Photos

Photos are added on a regular basis. Please visit again.

All images are 1024 x 768 JPG format, roughly 60 to 220 KB each.  Select link to view full size image.

View: 2003 | 2002 | 2001 | 2000

2003
June 2003 Misc.:
BTS1 on left & ACCEL Super-conducting cavity on right;
CLS interior-Looking NE;
Cryogenics Vent Line off of SR1 Cryogenics System;
SR1 looking towards BTS1 at injection;
SR1 Power Supply Electrical Connections;
Temporary Clean Room for SR1 Straight Installation;
May 2003 Misc.:
Fluid Cooler Sump Balancing Work;
Installation of BTS1 Shielding Wall Plug;
Installed BTS1 Girder Assemblies;
Installed BTS1 Girder AssembliesII;
Installed HEPA Air Unit for magnet mapping Rm.;
Positioned SR1 Super-Conducting RF Cavity from ACCEL;
April 2003 Misc.:
Arrival of Hall Probe Bench;
Optics metrology lab - 1;
Optics metrology lab - 2;
Pulling SR1 cabling through roof chicanes;
SR1 Cell #12;
SR1 Power Cable Installation;
March 2003 Misc.:
1st Installed Dipole Magnet in SR1 Cell #3;
OSR Lab with Optical Table Installed;
SGM - PGM Beamline Optical Mask;
SR1 Dipole Dolly with Magnet;
SR1 Dipole Dolly;
February 2003 Misc.:
Close up of installation;
Installation of cabling to SR1 power supplies;
Installation of Cell Vacuum Chamber into SR1 Magnets;
Mock-up of SR1 Cell #9 hook-up of water cooling system to SR1 magnets;
SR1 Cell #11 Vacuum Chamber goes into Bake-out oven;
January 2003 Misc.:
Completion of Old Mezzanine rennovations;
Fabrication of Storage Ring Piping;
First delivery of Storage Ring Orbit Corrector Magnets;
First Installed Storage Ring Vacuum Chamber;
First storage ring vacuum chamber goes into bake-out oven;
Storage ring cell #10 Sextapole (Red) and Quadrapole (Green) magnets;
Trial installation of Storage Ring piping for layout verification;

 

2002
December 2002 Misc.:
Far IR Lab;
Magnet Mapping Facility;
Mid IR Lab;
OSR Diagnostics Lab;
Temporary Services Installation in SR1 (Mock up);
Users Machine Shop;
Welding SR1 Piping;
November 2002 Misc.:
SR1 Mockup at Cell #9 - detail;
Installation work in the SR1 Tunnel;
Magnet Mapping Area Construction;
Mid IR Lab Construction;
SR1 Equipment Ready for Installation;
SR1 Magnets Assembled in the Storage Ring;
SR1 Mockup at Cell #9 for Mechanical and Electrical Coordination;
SR1 Quads and Sextupole Magnets;
SR1 RF Installation;
Vacuum Cleaning Bakeout Oven;
October 2002 Misc.:
IR Beamline Hutch;
Vacuum Assembly Area Construction;
Helium Cryogenics Vacuum-Jacketed line;
Installation of SR1 RF System;
SR1 Cooling Pipe Fabrication & Assembly;
SR1 Cooling Piping Installation;
SR1 Power Supply from IE Power;
September 2002 Misc.:
First Tin Foil;
Installed Nitrogen Tank;
Landscaping - SW corner of site;
Removed construction fense SE corner of site;
SR1 Concrete Pedestals;
SR1 Vacuum Chamber from FMB;
August 2002 Misc.:
Booster to Storage Transfer Line;
BR1 RF Yard;
BTS1 Installation;
Cryogenics - Helium Coldbox;
Cryogenics - Helium Dewar;
East Mezzanine Offices;
Metering Cabinet;
SR1 RF Cooling - Cryogenics - Helium Piping;
SR1 RF Cooling Piping;
July 2002 Misc.:
Cryogenics Compressors;
Cryogenics System Component- Cold Box;
Helium Tank - Installed;
Helium Tank - Preparing to install;
New office wing in mezzanine;
June 2002 Misc.:
Booster extraction at the BTS line;
Booster RF Cavities;
Control Room during LTB Commissioning;
East Mezzanine Offices;
LTB Line at the Booster on the Main Floor level;
Top of the cryogenics cold box in assembly;
25 Jan 2002 from North from NW from NE from South from SW from SE Misc.:
BR 1 area;
End of LBT 1;
PIC 1;
PIC 2;
PIC 3;
PIC 4;
Pumping down BR 1;
RF area;
Top of Shielding 1;
Welding;

Last modified: 2012-01-19 17:01:44